Investment idea's for solar 1 mw power plant

jdgroup

Senior Member
one mega watt power plant investment idea

1. space requirement -five acres land. Preferred near to sub-station (11kv-33kv)

2. estimated cost - 6.8 cr's tentative.

3. break even period - tentative 6 years time frame. Rec scheme & ppa cost play major impact on bep.

4. bank fund or loan - we can show the path & refer to the bank but maximum of loan depends on
credibility & against collateral.


5. time of installation - minimum 4 months & maximum 6 moths depending on client fund release & clearance.

6.government benefits - 1. Tax exemption on land registration 2. Tax waiver on imports 3. No transmission & wheeling charges ....

7. advantage - proper ppa & epc contract will fetch good return in the future
 

one mega watt power plant investment idea

1. space requirement -five acres land. Preferred near to sub-station (11kv-33kv)

2. estimated cost - 6.8 cr's tentative.

3. break even period - tentative 6 years time frame. Rec scheme & ppa cost play major impact on bep.

4. bank fund or loan - we can show the path & refer to the bank but maximum of loan depends on
credibility & against collateral.

5. time of installation - minimum 4 months & maximum 6 moths depending on client fund release & clearance.

6.government benefits - 1. Tax exemption on land registration 2. Tax waiver on imports 3. No transmission & wheeling charges ....

7. advantage - proper ppa & epc contract will fetch good return in the future
 

Hi,

Just to add few more points;

You can avail 80% accelerated depreciation in the 1st year itself
If the nearest substation can evacuate generated power @ 11Kv instead of 33Kv the cost gets cheaper
Of course there is wheeling and transmission charges levied and it differs with state to state
REC is not constant revenue business model whereas PPA assures constant revenue

Regards,

Saravana Kumar
CEO
Greencurrent Solar Energy Systems
 

@ saravana kumar
thanks for free suggestions.

Recommended points would be discussed with the client when we interact on call or mail.
 

one mega watt power plant investment idea

1. space requirement -five acres land. Preferred near to sub-station (11kv-33kv)

2. estimated cost - 6.8 cr's tentative.

3. break even period - tentative 6 years time frame. Rec scheme & ppa cost play major impact on bep.

4. bank fund or loan - we can show the path & refer to the bank but maximum of loan depends on
credibility & against collateral.

5. time of installation - minimum 4 months & maximum 6 moths depending on client fund release & clearance.

6.government benefits - 1. Tax exemption on land registration 2. Tax waiver on imports 3. No transmission & wheeling charges ....

7. advantage - proper ppa & epc contract will fetch good return in the future
 

one mega watt power plant investment idea

1. space requirement -five acres land. Preferred near to sub-station (11kv-33kv)

2. estimated cost - 6.8 cr's tentative.

3. break even period - tentative 6 years time frame. Rec scheme & ppa cost play major impact on bep.

4. bank fund or loan - we can show the path & refer to the bank but maximum of loan depends on
credibility & against collateral.

5. time of installation - minimum 4 months & maximum 6 moths depending on client fund release & clearance.

6.government benefits - 1. Tax exemption on land registration 2. Tax waiver on imports 3. No transmission & wheeling charges ....

7. advantage - proper ppa & epc contract will fetch good return in the future
 