hello Sir
Below are the expenses details
Bore well drilling first 200 feet - 43 per feet = 8600/-
next 100 feet 53 per feet = 5300/-
next 100 feet 70 per feet = 7000/-
next 100 feet 95 per feet = 5225/-
Initial 80 feet drilling with wider pipe for casing 120 per feet = 9600/- (surprisingly this should have been excluded in the initial 200 feet, but it is not. I do not understand the logic).
Labor charges = 600/-
Transportation charges = 600/-
Casing charges = 8000/-
Total = 44925/- + additional misc. expenses