madhuriitd
Active Member
Lease tenure required for 30 years or more.
Land must be within 3-4 kms. of electric sub station
Land owner would be responsible for obtaining all permissions for the land and RoW.
Land with boundary wall will be preferred.
Land in high radiation areas will be given priority.
Land must be within 3-4 kms. of electric sub station
Land owner would be responsible for obtaining all permissions for the land and RoW.
Land with boundary wall will be preferred.
Land in high radiation areas will be given priority.