vishwabangalore
New Member
Hi,
We had drilled borewell in my land last week ,got 2 inch of water at 650 feet. But the borewell guys are telling that the soil is week at 550-650 feet and 300 feet also which can collpase at any time. Let me know if its possibel to do casing at 550-650 feet and 300 feet also.
Please guide me sincerely whether casing can be done in between(300 feet) and end of the borewell(550-650)
Thanks and Regards,
Vishwa.