farming equipment

Hi reshma,
A shed of area 80000 square feet is required to raise 100 cows. For biogas another extra 2000- 10000 square feet is required.

Regards
Ashwini S
 

Hello,
1) how much water is needed for 100 cattle farming & biogas plant (per day).

2) How much green & dry fodder is needed for 100 cattle farming & biogas plant (per day)
 

hello Sir
Biogas plant in general needs 2 parts water for 1 part manure.
With 100 cattle you would get about 1000 kg. manure daily.
From 1000 kg manure 50 cubic meter gas can be generated.
The said quantity of Biogas will cater about 24 families
Or one can also generate electricity from the said quantity about 100 kWh Units.

For more details please get in touch with us on: info@maverikbiomethane.com
Cell: +91 989 806 2970
 

Back