India has potential of 19500 MW of power generation from Biomass surplus in India. Annually 350Million Ton of Biomass waste is generated in India. Currently 2500Mw approximate is generating from Biomass surplus in India.
Our Project is subsidized all over world. It requires very lesss space as compared to conventional power plants. These plants can be used as captive power plant, Rural Electrification, Grid connected power plants and also for thermal applications for Industrial purposes.
Raw Material used :
Waste wood
Root and stems of Trees
after corp Residues- Mustard, wheat, pulses, Rice, Sugarcane etc.
Saw dust
bamboo waste
Lanthana and Bamboo family trees.
All trees of agro forestry family.
rice husk
bagasse
wheat straw
Technical Specifications:
Technology used: Gasification
Gas produced: Producer gas or Syn gas
Minimum capacity for Grid Connected: 1MW.
Output voltage: 415V
connection : star Y
Rated Power factor: 0.85 Lag
Transformer used: 415V/11KV
Biomass Consumption: 1100-1200Kg/hr
Calorific Value of Gas:1300-1400Kcal/Nm3
Rated Output:1000KW
Gas Compisition :
CO- 19+/-3%
H2- 18+/-2%
CO2- 10+/-3%
CH4- up to 3%
N2- 50%
Commercial Benefits of Project
-- Capital Subsidy on project
-- Higher tariff
-- Carbon Credits
-- Charcoal Sale
-- REC's
-- Wheeling and Banking
-- Training Grants
-- Black Carbon sale
-- 70% : 30% Debt: Equity
-- 15 years PPA
-- No pollution zero sulfur content
Return on Investment is 20% - 36% Per Annum.
Total Project Cost: 4,85,00,000/- INR. (Turnkey solution)
Cost Include Machniery, Installation, commisioning, and civil work required for Establishment.
Subsidy 1,00,00,000/- INR.
Intrested may contact :
Our Project is subsidized all over world. It requires very lesss space as compared to conventional power plants. These plants can be used as captive power plant, Rural Electrification, Grid connected power plants and also for thermal applications for Industrial purposes.
Raw Material used :
Waste wood
Root and stems of Trees
after corp Residues- Mustard, wheat, pulses, Rice, Sugarcane etc.
Saw dust
bamboo waste
Lanthana and Bamboo family trees.
All trees of agro forestry family.
rice husk
bagasse
wheat straw
Technical Specifications:
Technology used: Gasification
Gas produced: Producer gas or Syn gas
Minimum capacity for Grid Connected: 1MW.
Output voltage: 415V
connection : star Y
Rated Power factor: 0.85 Lag
Transformer used: 415V/11KV
Biomass Consumption: 1100-1200Kg/hr
Calorific Value of Gas:1300-1400Kcal/Nm3
Rated Output:1000KW
Gas Compisition :
CO- 19+/-3%
H2- 18+/-2%
CO2- 10+/-3%
CH4- up to 3%
N2- 50%
Commercial Benefits of Project
-- Capital Subsidy on project
-- Higher tariff
-- Carbon Credits
-- Charcoal Sale
-- REC's
-- Wheeling and Banking
-- Training Grants
-- Black Carbon sale
-- 70% : 30% Debt: Equity
-- 15 years PPA
-- No pollution zero sulfur content
Return on Investment is 20% - 36% Per Annum.
Total Project Cost: 4,85,00,000/- INR. (Turnkey solution)
Cost Include Machniery, Installation, commisioning, and civil work required for Establishment.
Subsidy 1,00,00,000/- INR.
Intrested may contact :