Business Opportunities in Agriculture: 150 Field Interviews (Book)

Biogas Enrichment and its Utilisation Plant

Register

Click Here!

Dear Sir,

We are a Energy Service Company (ESCO) accredited by Bureau of Energy Efficiency (BEE), Ministry of Power, Government of India and actively involved in energy audit, energy efficiency and renewable energy projects since 1995.

Now we can render our services on turnkey basis for installation of biogas purification and its utilization plant like cooking, power generation & bottling for vehicular fuels. The industrial units like sugar, paper, biotech, distillery and any units having Effluent Treatment Plant (ETP) can get very good revenue from their existing ETP by installing Biogas Purification Plant, for which we have mentioned some information on a typical plant capacity as below.

FAQ ABOUT ZMS BASED BIOGAS PURIFICATION PLANT
1. What quantity of water is required for 500M3/hr enrichment plant?

WATER IS NOT REQUIRED FOR ZMS SYSTEM. WATER IS REQUIRED ONLY FOR COMPRESSOR COOLING.

2. Whether any CHEMICALS will be required for the process. If YES, indicate it with quantity requirements with their cost.

ZINC CATALYST AND ACTIVATED CARBON ARE REQUIRED TO BE REPLACED ONCE IN A YEAR TO 2 YEARS. (DEPENDING UPON H2S CONTENTS IN GAS). PRESENTLY THE CHARGE OF THESE CHEMICALS WILL COST AROUND RS.2 LACS.

3. Is it necessary to replace (Charge again) Activated alumina and Zeolite Molecular Sieves (ZMS)? Please indicate the duration of charging.

ZMS AND ACTIVATED ALUMINA ARE REQUIRED TO BE REPLACED AFTER AROUND 5-6 YEARS.

4. What quantity of Activated alumina and Zeolite Molecular Sieves (ZMS) required per batch of charging and what is the cost.

ZMS 1200 KG AND ACTIVATED ALUMINA 600 KGS IS THE CHARGE QUANTITY. AS PER TODAYS PRICE, THE CHARGE WILL COST AROUND RS. 10.0 LACS

5. Is (Activated alumina and Zeolite Molecular Sieves (ZMS)) it available in the market and who are the suppliers?

ZMS AND ACTIVATED ALUMINA CAN BE SUPPLIED BY US.

6. What is the manpower required to operate the plant.

ONE OPERATOR IS ADEQUATE. EVEN THE OPERATOR NEED NOT BE PRESENT ALWAYS. THE PLANT IS PRACTICALLY OPERATORLESS.

ADVANTAGES OF ZEOLITE MOLECULAR SIEVES

• Enrichment of raw – biogas through high grade imported ZMS sieves.

• Impurities of H2S & CO2 are adsorbed & vented.

• Process for storage & enrichment of vented CO2 under progress.

• 95 – 97% content of CH4 assured, with balance CO2.

• No water required, negligible power consumption.

• PLC based semi-automatic operations.

• Ideal for industrial application.

• Available in 500 – 12,000 m3/per day capacities.
(Bigger capacity on request )

• For use in big cattle dairy farms, food processing industry, sugar industry, distilleries, chemical plants, hotels, railway stations, airports, municipal waists, and sewage treatment plant.

• Advantages of purification of raw biogas – high heat value – better engine life (generator OR vehicular) – ready replacement of fossil fuels.

Salient Features of a 500m3/hr Biogas Enrichment and Bottling Plant

Plant Capacity: 500m3/Hr
Biogas Generation: 10000 cum/day
Equivalent CNG Approx.: 4500 kg / day
Area Required For Plant: Approx. 100 sq.m
CNG production per annum: 1575000 kg
Selling of CNG per annum @Rs.30: Rs.472,50,000/-
Total Project Cost: Rs.200,00,000/-
Subsidy @25%: Rs.50,00,000/-
Payback period: 6 months


We can render our turnkey consultancy for following services:

1. Design, Engineering, Preparing Detailed Project Report (DPR) as per MNRE
2. Supply for Zeolite Molecular Sieves (PSA) Type biogas Enrichment plant
3. Supply for Biogas Compression plant
4. EPC Consultancy services

If you desire any further techno-commercial details/ clarifications please feel free to get in touch.

Thanking you and assuring you the best of our services and attention at all times.

With best regards,
 
Last edited by a moderator:

Business Opportunities in Agriculture: 150 Field Interviews (Book)

prathi66

New Member
hi

we are getting around 1000kgs of cow/buffalo's dung everyday in our farm. want to set up a ideal, maintenace free bio-gas producing set up as well as min. 15 kva bio-genset which shall able to operate 3 hours morning and 3 hours evening. the place is in karnataka near uppinaangadi.

are you able to send the proposal with clear area requirement, system diagram,quote, terms and conditions to us on premjith19atymaildotcom.

thanks ,

prem.


Dear Sir,

We are a Energy Service Company (ESCO) accredited by Bureau of Energy Efficiency (BEE), Ministry of Power, Government of India and actively involved in energy audit, energy efficiency and renewable energy projects since 1995.

Now we can render our services on turnkey basis for installation of biogas purification and its utilization plant like cooking, power generation & bottling for vehicular fuels. The industrial units like sugar, paper, biotech, distillery and any units having Effluent Treatment Plant (ETP) can get very good revenue from their existing ETP by installing Biogas Purification Plant, for which we have mentioned some information on a typical plant capacity as below.

FAQ ABOUT ZMS BASED BIOGAS PURIFICATION PLANT
1. What quantity of water is required for 500M3/hr enrichment plant?

WATER IS NOT REQUIRED FOR ZMS SYSTEM. WATER IS REQUIRED ONLY FOR COMPRESSOR COOLING.

2. Whether any CHEMICALS will be required for the process. If YES, indicate it with quantity requirements with their cost.

ZINC CATALYST AND ACTIVATED CARBON ARE REQUIRED TO BE REPLACED ONCE IN A YEAR TO 2 YEARS. (DEPENDING UPON H2S CONTENTS IN GAS). PRESENTLY THE CHARGE OF THESE CHEMICALS WILL COST AROUND RS.2 LACS.

3. Is it necessary to replace (Charge again) Activated alumina and Zeolite Molecular Sieves (ZMS)? Please indicate the duration of charging.

ZMS AND ACTIVATED ALUMINA ARE REQUIRED TO BE REPLACED AFTER AROUND 5-6 YEARS.

4. What quantity of Activated alumina and Zeolite Molecular Sieves (ZMS) required per batch of charging and what is the cost.

ZMS 1200 KG AND ACTIVATED ALUMINA 600 KGS IS THE CHARGE QUANTITY. AS PER TODAYS PRICE, THE CHARGE WILL COST AROUND RS. 10.0 LACS

5. Is (Activated alumina and Zeolite Molecular Sieves (ZMS)) it available in the market and who are the suppliers?

ZMS AND ACTIVATED ALUMINA CAN BE SUPPLIED BY US.

6. What is the manpower required to operate the plant.

ONE OPERATOR IS ADEQUATE. EVEN THE OPERATOR NEED NOT BE PRESENT ALWAYS. THE PLANT IS PRACTICALLY OPERATORLESS.

ADVANTAGES OF ZEOLITE MOLECULAR SIEVES

• Enrichment of raw – biogas through high grade imported ZMS sieves.

• Impurities of H2S & CO2 are adsorbed & vented.

• Process for storage & enrichment of vented CO2 under progress.

• 95 – 97% content of CH4 assured, with balance CO2.

• No water required, negligible power consumption.

• PLC based semi-automatic operations.

• Ideal for industrial application.

• Available in 500 – 12,000 m3/per day capacities.
(Bigger capacity on request )

• For use in big cattle dairy farms, food processing industry, sugar industry, distilleries, chemical plants, hotels, railway stations, airports, municipal waists, and sewage treatment plant.

• Advantages of purification of raw biogas – high heat value – better engine life (generator OR vehicular) – ready replacement of fossil fuels.

Salient Features of a 500m3/hr Biogas Enrichment and Bottling Plant

Plant Capacity: 500m3/Hr
Biogas Generation: 10000 cum/day
Equivalent CNG Approx.: 4500 kg / day
Area Required For Plant: Approx. 100 sq.m
CNG production per annum: 1575000 kg
Selling of CNG per annum @Rs.30: Rs.472,50,000/-
Total Project Cost: Rs.200,00,000/-
Subsidy @25%: Rs.50,00,000/-
Payback period: 6 months


We can render our turnkey consultancy for following services:

1. Design, Engineering, Preparing Detailed Project Report (DPR) as per MNRE
2. Supply for Zeolite Molecular Sieves (PSA) Type biogas Enrichment plant
3. Supply for Biogas Compression plant
4. EPC Consultancy services

If you desire any further techno-commercial details/ clarifications please feel free to get in touch.

Thanking you and assuring you the best of our services and attention at all times.

With best regards,
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)


Business Opportunities in Agriculture: 150 Field Interviews (Book)

arvindanch

New Member
Pl. give detail of

For Plant Capacity: 500m3/Hr, How many Cow/Buffalo required ?

Or

For 100 Cows - How Much Plant Capacity
For 200 Cows - How Much Plant Capacity
For 500 Cows - How Much Plant Capacity
For 1000 Cows - How Much Plant Capacity

Pl. PM your contact details, too.
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)

Purification of Bio Gas

Dear Sir,

We are a Energy Service Company (ESCO) accredited by Bureau of Energy Efficiency (BEE), Ministry of Power, Government of India and actively involved in energy audit, energy efficiency and renewable energy projects since 1995.

Now we can render our services on turnkey basis for installation of biogas purification and its utilization plant like cooking, power generation & bottling for vehicular fuels. The industrial units like sugar, paper, biotech, distillery and any units having Effluent Treatment Plant (ETP) can get very good revenue from their existing ETP by installing Biogas Purification Plant, for which we have mentioned some information on a typical plant capacity as below.

FAQ ABOUT ZMS BASED BIOGAS PURIFICATION PLANT
1. What quantity of water is required for 500M3/hr enrichment plant?

WATER IS NOT REQUIRED FOR ZMS SYSTEM. WATER IS REQUIRED ONLY FOR COMPRESSOR COOLING.

2. Whether any CHEMICALS will be required for the process. If YES, indicate it with quantity requirements with their cost.

ZINC CATALYST AND ACTIVATED CARBON ARE REQUIRED TO BE REPLACED ONCE IN A YEAR TO 2 YEARS. (DEPENDING UPON H2S CONTENTS IN GAS). PRESENTLY THE CHARGE OF THESE CHEMICALS WILL COST AROUND RS.2 LACS.

3. Is it necessary to replace (Charge again) Activated alumina and Zeolite Molecular Sieves (ZMS)? Please indicate the duration of charging.

ZMS AND ACTIVATED ALUMINA ARE REQUIRED TO BE REPLACED AFTER AROUND 5-6 YEARS.

4. What quantity of Activated alumina and Zeolite Molecular Sieves (ZMS) required per batch of charging and what is the cost.

ZMS 1200 KG AND ACTIVATED ALUMINA 600 KGS IS THE CHARGE QUANTITY. AS PER TODAYS PRICE, THE CHARGE WILL COST AROUND RS. 10.0 LACS

5. Is (Activated alumina and Zeolite Molecular Sieves (ZMS)) it available in the market and who are the suppliers?

ZMS AND ACTIVATED ALUMINA CAN BE SUPPLIED BY US.

6. What is the manpower required to operate the plant.

ONE OPERATOR IS ADEQUATE. EVEN THE OPERATOR NEED NOT BE PRESENT ALWAYS. THE PLANT IS PRACTICALLY OPERATORLESS.

ADVANTAGES OF ZEOLITE MOLECULAR SIEVES

• Enrichment of raw – biogas through high grade imported ZMS sieves.

• Impurities of H2S & CO2 are adsorbed & vented.

• Process for storage & enrichment of vented CO2 under progress.

• 95 – 97% content of CH4 assured, with balance CO2.

• No water required, negligible power consumption.

• PLC based semi-automatic operations.

• Ideal for industrial application.

• Available in 500 – 12,000 m3/per day capacities.
(Bigger capacity on request )

• For use in big cattle dairy farms, food processing industry, sugar industry, distilleries, chemical plants, hotels, railway stations, airports, municipal waists, and sewage treatment plant.

• Advantages of purification of raw biogas – high heat value – better engine life (generator OR vehicular) – ready replacement of fossil fuels.

Salient Features of a 500m3/hr Biogas Enrichment and Bottling Plant

Plant Capacity: 500m3/Hr
Biogas Generation: 10000 cum/day
Equivalent CNG Approx.: 4500 kg / day
Area Required For Plant: Approx. 100 sq.m
CNG production per annum: 1575000 kg
Selling of CNG per annum @Rs.30: Rs.472,50,000/-
Total Project Cost: Rs.200,00,000/-
Subsidy @25%: Rs.50,00,000/-
Payback period: 6 months


We can render our turnkey consultancy for following services:

1. Design, Engineering, Preparing Detailed Project Report (DPR) as per MNRE
2. Supply for Zeolite Molecular Sieves (PSA) Type biogas Enrichment plant
3. Supply for Biogas Compression plant
4. EPC Consultancy services

If you desire any further techno-commercial details/ clarifications please feel free to get in touch.

Thanking you and assuring you the best of our services and attention at all times.

With best regards,
Can you design purification plant for 8 cub mtrs capacity bio gas plant?
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)

Free services for application on biogas project

Dear All,

We are a Energy Service Company (ESCO) accredited by Bureau of Energy Efficiency (BEE), Government of India and emapnelled consultant for many State Governments.

We are going to MNRE, Delhi on 2nd week of August, 2012 for application of a Biomass power project. We will be at there for seven days upto 15th August. If any entrepreneure who had contacted us earlier for biogas project (Electricity Generation and Compressed Biogas) can get our services for application to MNRE, Delhi for approvals of the project for loan and subsidy on free of cost.

So we request you all to contact us with all required documents on or before 7th August, 2012. If any one interested for fresh DPR preparation then it should be before 2nd August, 2012. For fresh DPR preparation, the charges will be Rs.25000/- plus service tax @12.36%.

Thanks and regards.
Pramod Hati
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)

shinghal

New Member
Biogas enrichment and its utilization plant

Please inform the following:
1. What is the project cost for a 20,000 kg cow dung per day plant?
2. How does the enrichment process compare with high pressure water adsorption?
3. What are the subsidies for the project?
Gaurav Shinghal
 
Last edited by a moderator:

Business Opportunities in Agriculture: 150 Field Interviews (Book)

priyank9

New Member
how much cow dung is required for 500m3 capacity of biogas plant which we want to setup for manufacture of CNG...
can u plz send me d quotes about d plant
regards
priyank
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)

Dung Requirement for 500 cum per day Biogas plant

Dear Sir,

The cow dung requirement for 500 cum per day biogas plant will be 10 Ton per day. The quotation can be prepared if you will send your requirement with technical specification. We can prepare all the technical specification at the time of preparation of DPR.

However for your information the project cost will be Rs.80 lac to Rs.100 lacs for 500 cum per day biogas plant, purification and compression unit.

Thanks and regards.
Pramod Hati
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)


Business Opportunities in Agriculture: 150 Field Interviews (Book)


Business Opportunities in Agriculture: 150 Field Interviews (Book)

Gas Generation

Dear Sir,

From 500 cum capacity plant you can get 225 kg of purified biogas (Equivalent of CNG/LPG) per day. If it will replace commercial / industrial LPG/ Petrol for Vehicles, then can be marketed upto Rs.60/- per kg.
Please contact us for further in our mail i

Regards.
Pramod Hati
 
Last edited by a moderator:

Business Opportunities in Agriculture: 150 Field Interviews (Book)

priyank9

New Member
u didnt tell me dat will d cost include bottling plant also???
and is dere any subsidy given by d govt.????
m waiting for ur reply ma dese two queries...:)
regards
priyank
 

Business Opportunities in Agriculture: 150 Field Interviews (Book)

Top