rajputanaherbal19
New Member
Dear Sirs,
A) Our’ is 100% Herbal and fully Agro based Henna, Mehandi Powder and other below mentioned products from the raw material of Sojat City of Rajasthan.
Actually in initial stage Perfumed Supari of Assam was included as Prime Project, but could not be started as yet, reasons are described under point “B” as titled “Grievances of Prime Project”.
We are manufacturer of Henna packed pouch, bearing Brand Trade mark Name: "Rajputana Herbal” and other herbal "Beauty Wellness" products for Hair / Skin, as per Physiology & Anatomy of HAIR / SKIN.
We also pack Powder form of Amla, Shikakai, Reetha, Multani Clay for Face & Body Pack (Purely refined), Neem Face Pack, and Chandan (Sandal) Face Pack, Rose Water, and Mehandi Oil.
Our unit is based at Guwahati, Assam – 781005.
Our’ is a Tiny scale, Women’s Venture (Proprietorship Unit), successfully working since last 15 years with Tiny capacity in and NE region, earned name & fame too.
Sojat Rates is essential to know daily!
We are buying bulk Mehandi Powder from Sojat City, but always remained unknown from running / existing Mandi / Market rate of Henna Leaves and Mehandi Powder, hence all time facing losses from Suppliers', in want of source of knowing daily rates of above, and our competition is with “Godrej”, Ayur, Shahnaz Hussain, VLCC etc. etc.
This is a Herculean Task to compete with them, but in our area of operation we are clicked being Consumers’ favorite by our genuine and sovereign quality, though our cost of production is very high, but consumers’ full support are with us upto their entire satisfaction, is our grand success.
All our Products are 100% pure and Soil related in lineage of Indian Heritage, which were being used by ancient Queens of “Rajputana” and “Mugals”.
Basic concept is above!
We are assigned with “Big Bazaar”, “FB-Pantaloon”, “Maxmart” & Big Malls of the Guwahati and NE region.
.
B)GRIEVANCES OF PRIME PROJECT & FUND IDEA NEEDED, UNDER DESTRUCTIVE ATTITUDE OF NEDFi, [MIN OF DoNER (HOME)]:
1) Kindly may please be noted our PRIME PROJECT was “LOCAL SUPARI”.
2) NEDFi made DEFICIT FINANCE in the year 2001 to Rs. 8.5 Lakhs against Mortgage of Property worth above to Rs. 1 (one) Crore, while original Proposal was Rs.20 Lakh, which they cut short in NEEF Loan (which is upto Rs. 25 Lakh), for Local Agro based “SUPARI” Industry?
3) They made the Project NON-VIABLE!
4) They Deleted “Water Connection” in the Project Cost.
5) They did not review the Project, neither Cost nor Deficit Finance, before disbursement of fund.
6) On our spot protest while signing the Agreement, they replied, please don’t worry, please send your written reminder later on, we will re-fix every thing as to need immediately, and insisted, now please sign & don’t delay this final stage, plz understand our difficulty of re-working from the very beginning , we will provide you all needed assistance in due time.
Why they did so, I could not guess, but I smelled hidden corruption in such irregularities, I may be wrong!
7) After that despite our innumerable reminders, approaches and follow ups on the above matter and facts, never they replied, further neither they reviewed the Project Cost nor Allocated the “Water Connection”, rather remained sleeping for 7 (seven) years.
8) Knowing the fact that a Human being can not live without “Air.” and “Water”,
Vice-verse
An Industry also can not survive without “Water” and “Electricity”.
9) Hence, Prime Project could not be started from the year 2001 itself, optionally we had to take challenge of “WITHOUT WATER PROJECT” and plunged into above stated products i.e. Rajasthan Agro based Raw Materials, to carry on the battle of Manufacturing with mettle attitude and achieve our Goal!
10) Then we approached them for NOC, to arrange needed fund from other Financial Institution,
But they flatly denied on NOC, being our parent Unit even!
11) In the year 2007, we received a sweet undated letter from CMD NEDFi, inviting us, that hamper caused by them to us would be resolved, we kept continuous approaches on all the issues as above, but they kept us faltering for long period on the pretext of this & that! But pretended that assistance / help would be informed to us at their end shortly. We had no alternate to look upon them!
12) Most surprisingly mean while they manipulated ex-parte Decree from PO of DRT Guwahati, and along with we received the Order of Attachment of Property from Debt Recovery Officer on 23/10/2009!
13) We contested, challenged for our hearing, against Ex-parte Decree & Rule out the Attachment Order.
Decree Set aside, Order of Attachment cancelled.
Case Restored on 04/01/2011.
Now Case is going on hearing in the Court of PO of DRT Guwahati, in the same chair.
14) NEDFi being frustrated issued “SAFAESI” Notice simultaneously for attachment, our OTS also rejected by them!
15) We filed a writ in the GUWAHATI HIGH COURT for stay of “SARFAESI”,
Court has summoned to NEDFi now, process is on HC level simultaneously.
Sir, plz be noted that for all Central Subsidies, NEDFi has vital role including all types of Registrations and concerned recommendations.
Sir, one thing is quite clear that from the day of sanction of advance by the NEDFi, they have acted fraudulently, deceived the borrowers and in convenience with some active group has hatched plan to grab the prime location landed property of ours.
Sir, plz show us the path and IDEA OF FUND to avail from other source and compensation from NEDFi too, under above circumstances of stated FACTS!
With best regards,
Brijmohan CEO.
A) Our’ is 100% Herbal and fully Agro based Henna, Mehandi Powder and other below mentioned products from the raw material of Sojat City of Rajasthan.
Actually in initial stage Perfumed Supari of Assam was included as Prime Project, but could not be started as yet, reasons are described under point “B” as titled “Grievances of Prime Project”.
We are manufacturer of Henna packed pouch, bearing Brand Trade mark Name: "Rajputana Herbal” and other herbal "Beauty Wellness" products for Hair / Skin, as per Physiology & Anatomy of HAIR / SKIN.
We also pack Powder form of Amla, Shikakai, Reetha, Multani Clay for Face & Body Pack (Purely refined), Neem Face Pack, and Chandan (Sandal) Face Pack, Rose Water, and Mehandi Oil.
Our unit is based at Guwahati, Assam – 781005.
Our’ is a Tiny scale, Women’s Venture (Proprietorship Unit), successfully working since last 15 years with Tiny capacity in and NE region, earned name & fame too.
Sojat Rates is essential to know daily!
We are buying bulk Mehandi Powder from Sojat City, but always remained unknown from running / existing Mandi / Market rate of Henna Leaves and Mehandi Powder, hence all time facing losses from Suppliers', in want of source of knowing daily rates of above, and our competition is with “Godrej”, Ayur, Shahnaz Hussain, VLCC etc. etc.
This is a Herculean Task to compete with them, but in our area of operation we are clicked being Consumers’ favorite by our genuine and sovereign quality, though our cost of production is very high, but consumers’ full support are with us upto their entire satisfaction, is our grand success.
All our Products are 100% pure and Soil related in lineage of Indian Heritage, which were being used by ancient Queens of “Rajputana” and “Mugals”.
Basic concept is above!
We are assigned with “Big Bazaar”, “FB-Pantaloon”, “Maxmart” & Big Malls of the Guwahati and NE region.
.
B)GRIEVANCES OF PRIME PROJECT & FUND IDEA NEEDED, UNDER DESTRUCTIVE ATTITUDE OF NEDFi, [MIN OF DoNER (HOME)]:
1) Kindly may please be noted our PRIME PROJECT was “LOCAL SUPARI”.
2) NEDFi made DEFICIT FINANCE in the year 2001 to Rs. 8.5 Lakhs against Mortgage of Property worth above to Rs. 1 (one) Crore, while original Proposal was Rs.20 Lakh, which they cut short in NEEF Loan (which is upto Rs. 25 Lakh), for Local Agro based “SUPARI” Industry?
3) They made the Project NON-VIABLE!
4) They Deleted “Water Connection” in the Project Cost.
5) They did not review the Project, neither Cost nor Deficit Finance, before disbursement of fund.
6) On our spot protest while signing the Agreement, they replied, please don’t worry, please send your written reminder later on, we will re-fix every thing as to need immediately, and insisted, now please sign & don’t delay this final stage, plz understand our difficulty of re-working from the very beginning , we will provide you all needed assistance in due time.
Why they did so, I could not guess, but I smelled hidden corruption in such irregularities, I may be wrong!
7) After that despite our innumerable reminders, approaches and follow ups on the above matter and facts, never they replied, further neither they reviewed the Project Cost nor Allocated the “Water Connection”, rather remained sleeping for 7 (seven) years.
8) Knowing the fact that a Human being can not live without “Air.” and “Water”,
Vice-verse
An Industry also can not survive without “Water” and “Electricity”.
9) Hence, Prime Project could not be started from the year 2001 itself, optionally we had to take challenge of “WITHOUT WATER PROJECT” and plunged into above stated products i.e. Rajasthan Agro based Raw Materials, to carry on the battle of Manufacturing with mettle attitude and achieve our Goal!
10) Then we approached them for NOC, to arrange needed fund from other Financial Institution,
But they flatly denied on NOC, being our parent Unit even!
11) In the year 2007, we received a sweet undated letter from CMD NEDFi, inviting us, that hamper caused by them to us would be resolved, we kept continuous approaches on all the issues as above, but they kept us faltering for long period on the pretext of this & that! But pretended that assistance / help would be informed to us at their end shortly. We had no alternate to look upon them!
12) Most surprisingly mean while they manipulated ex-parte Decree from PO of DRT Guwahati, and along with we received the Order of Attachment of Property from Debt Recovery Officer on 23/10/2009!
13) We contested, challenged for our hearing, against Ex-parte Decree & Rule out the Attachment Order.
Decree Set aside, Order of Attachment cancelled.
Case Restored on 04/01/2011.
Now Case is going on hearing in the Court of PO of DRT Guwahati, in the same chair.
14) NEDFi being frustrated issued “SAFAESI” Notice simultaneously for attachment, our OTS also rejected by them!
15) We filed a writ in the GUWAHATI HIGH COURT for stay of “SARFAESI”,
Court has summoned to NEDFi now, process is on HC level simultaneously.
Sir, plz be noted that for all Central Subsidies, NEDFi has vital role including all types of Registrations and concerned recommendations.
Sir, one thing is quite clear that from the day of sanction of advance by the NEDFi, they have acted fraudulently, deceived the borrowers and in convenience with some active group has hatched plan to grab the prime location landed property of ours.
Sir, plz show us the path and IDEA OF FUND to avail from other source and compensation from NEDFi too, under above circumstances of stated FACTS!
With best regards,
Brijmohan CEO.
Last edited by a moderator: