Hi everyone! I am preparing a project plan for a small ghee production plant (approx 200kg per day). I have seen photos etc of the required machinery but cannot visualise how it all fits together. The project anticipates manufacturing butter from which the ghee will be made (over a 14 day maturation period). So, I expect machinery such as a butter churn; double skin vessels for controlled temperature; a ghee boiler; temperature controlled settling tank; and small bottling line .... How does it all fit together? What space do I need? What are the water; gas and electricity requirements? These are the questions I hope someone on this forum can answer and help me with .... I look forward to hearing from you all soon.:rolleyes:
 