All types of equipment available for setting up of beer, juice and any other type of beverage production. Provide consultancy for a nominal sum for setting up these plants.
Initial project report will cost 2000 Rs (only soft copy in word/PDF files provided).
Customized and detailed report with engineering drawing and other technical data with equipment specifications will be later sent as per request.
You can contact on the e-mail ID: hks1971@gmail.com
Thanks and regards
H K
Initial project report will cost 2000 Rs (only soft copy in word/PDF files provided).
Customized and detailed report with engineering drawing and other technical data with equipment specifications will be later sent as per request.
You can contact on the e-mail ID: hks1971@gmail.com
Thanks and regards
H K