Post Business Model_Biogas-2 LPG Equiv production Per Acre/Day

Hi All,

Renewable Energy:Biogas For Cooking/electricity(Replacing Commercial LPG)

Introduction:
India's One of the successful economical renewable energy is Biogas System.Based on our 4 years R & D we developed Adsorbed Biogas storage technology.Based on this technology we can transport biogas at very low pressure in cylinders.

We have choosen biomass based Biogas production.As per our field study which we carried out Biogas production is 20-25 kg equivalent LPG production per acre/day using our Biomass(perrenial grass).

About
Raw material:

Yield: 400 tons/hecter/annum green yield
Dry Yield: 65 tons/hecter/annum
Yileding starts from 45th day
Grass life span: 15- 20 years

Raw material rhizome/seed imported from European country.

Adsorbtion technology

* Adsorbent filled Cylinder of 40 liters capacity can hold 5.5 kg of Biogas.
* Adsorbent was developed by us.
* Biogas can be stored at relatively low pressure(30-35 bar)
* Adsorbed Biogas can be used for cooking/small scale inhouse electricity production.

Note: at present purified Biogas(Methane) can be stored at 220 bar.

Adsorption technology is next generation Natural gas(Methane) storage,Initial R & D happened in University of missouri. based on same process we developed in India too.

Target Industry:

Hotels/Restaurant/Educational Institutions etc.,

Future Growth:

We are in the process of developing next stage of adsorbent so that we ccan use these gases for vehicle fuel(Alternative for LPG and CNG).

As per our field study we can cultivate our Biomass resource can be cultivate all over India.so we can replicate the same project all over India.

Project Cost Estimated: Around 2 Crores
Pay back period: 4 yrs (Interest rate:14 %)
Govt Subsidy: not included.

We are looking supporters/Investors for this above project.

Project Pilot demno can be given at our place.

Thanks & Regards,

K.L.Narayanan.

M/s.EMSI
Chennai

Last edited by moderator B; 06-29-2009 at 06:30 PM. Reason: Only Business Members are allowed to post contact info. Please click “Upgrade” to become a Business Member.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
  #2 (permalink)  
Old 06-30-2009
Junior Member
 
Join Date: Jun 2009
Posts: 2
sangames is on a distinguished road
Default Biogas

Hi.
We r intrested in biogas we have one big goshala near to hyderabad (andrapardesh)we have 6000to 7000 cows can u pl sugest us to bottling sistem biogas .

Last edited by moderator B; 07-01-2009 at 11:48 AM. Reason: Only Business Members are allowed to post contact info. Please click “Upgrade” to become a Business Member.
Digg this Post!Add Post to del.icio.usBookmark Post in TechnoratiFurl this Post!
Reply With Quote
Closed Thread

Tags
biogas, business model, renewable energy
Expired Thread The thread "Business Model_Biogas-2 LPG Equiv production Per Acre/Day" has not received any replies for a month. It has been automatically closed as a result. You may start a new thread on the topic if the information in this thread is not sufficient.


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On



All times are GMT +5.5. The time now is 11:14 AM.